How long will it take to carry out the structural engineers inspection and for the report to be written up?

All our work is logged to a central data base. This is later booked into our engineers work programmes, generally based on suburb runs. As you may appreciate there is quite a back log which currently equates to a queue time approximately two weeks. We aim to produce the associated report within ten working days of the inspection. Wherever possible you will be contacted with an approximate appointment time, generally 24 hours before the inspection.